资源类型

期刊论文 736

会议视频 24

年份

2024 3

2023 84

2022 84

2021 77

2020 66

2019 45

2018 40

2017 40

2016 27

2015 32

2014 24

2013 24

2012 22

2011 14

2010 24

2009 10

2008 19

2007 25

2006 13

2005 19

展开 ︾

关键词

神经网络 23

风险分析 9

风险管理 7

人工神经网络 6

优化 5

风险评估 5

人工智能 4

智能制造 4

机器学习 4

BP神经网络 3

能源 3

风险 3

风险控制 3

仿真 2

农业科学 2

医学 2

安全风险 2

微波遥感 2

控制 2

展开 ︾

检索范围:

排序: 展示方式:

Hybrid deep learning model for risk prediction of fracture in patients with diabetes and osteoporosis

《医学前沿(英文)》 2022年 第16卷 第3期   页码 496-506 doi: 10.1007/s11684-021-0828-7

摘要: The fracture risk of patients with diabetes is higher than those of patients without diabetes due to hyperglycemia, usage of diabetes drugs, changes in insulin levels, and excretion, and this risk begins as early as adolescence. Many factors including demographic data (such as age, height, weight, and gender), medical history (such as smoking, drinking, and menopause), and examination (such as bone mineral density, blood routine, and urine routine) may be related to bone metabolism in patients with diabetes. However, most of the existing methods are qualitative assessments and do not consider the interactions of the physiological factors of humans. In addition, the fracture risk of patients with diabetes and osteoporosis has not been further studied previously. In this paper, a hybrid model combining XGBoost with deep neural network is used to predict the fracture risk of patients with diabetes and osteoporosis, and investigate the effect of patients’ physiological factors on fracture risk. A total of 147 raw input features are considered in our model. The presented model is compared with several benchmarks based on various metrics to prove its effectiveness. Moreover, the top 18 influencing factors of fracture risks of patients with diabetes are determined.

关键词: XGBoost     deep neural network     healthcare     risk prediction    

Two-stage stochastic programming with robust constraints for the logistics network post-disruption response

《工程管理前沿(英文)》   页码 67-81 doi: 10.1007/s42524-022-0240-2

摘要: Logistics networks (LNs) are essential for the transportation and distribution of goods or services from suppliers to consumers. However, LNs with complex structures are more vulnerable to disruptions due to natural disasters and accidents. To address the LN post-disruption response strategy optimization problem, this study proposes a novel two-stage stochastic programming model with robust delivery time constraints. The proposed model jointly optimizes the new-line-opening and rerouting decisions in the face of uncertain transport demands and transportation times. To enhance the robustness of the response strategy obtained, the conditional value at risk (CVaR) criterion is utilized to reduce the operational risk, and robust constraints based on the scenario-based uncertainty sets are proposed to guarantee the delivery time requirement. An equivalent tractable mixed-integer linear programming reformulation is further derived by linearizing the CVaR objective function and dualizing the infinite number of robust constraints into finite ones. A case study based on the practical operations of the JD LN is conducted to validate the practical significance of the proposed model. A comparison with the rerouting strategy and two benchmark models demonstrates the superiority of the proposed model in terms of operational cost, delivery time, and loading rate.

关键词: logistics network design     post-disruption response strategy     two-stage stochastic programming     conditional value at risk     robust constraint    

Molecular network-based intervention brings us closer to ending the HIV pandemic

Xiaoxu Han, Bin Zhao, Minghui An, Ping Zhong, Hong Shang

《医学前沿(英文)》 2020年 第14卷 第2期   页码 136-148 doi: 10.1007/s11684-020-0756-y

摘要: Precise identification of HIV transmission among populations is a key step in public health responses. However, the HIV transmission network is usually difficult to determine. HIV molecular networks can be determined by phylogenetic approach, genetic distance-based approach, and a combination of both approaches. These approaches are increasingly used to identify transmission networks among populations, reconstruct the history of HIV spread, monitor the dynamics of HIV transmission, guide targeted intervention on key subpopulations, and assess the effects of interventions. Simulation and retrospective studies have demonstrated that these molecular network-based interventions are more cost-effective than random or traditional interventions. However, we still need to address several challenges to improve the practice of molecular network-guided targeting interventions to finally end the HIV epidemic. The data remain limited or difficult to obtain, and more automatic real-time tools are required. In addition, molecular and social networks must be combined, and technical parameters and ethnic issues warrant further studies.

关键词: human immunodeficiency virus type 1     molecular cluster     transmission cluster     risk network     targeted intervention     evaluation    

Risk evaluation for the task transfer of an aircraft maintenance program based on a multielement connection

《工程管理前沿(英文)》 doi: 10.1007/s42524-023-0282-0

摘要: This paper proposes a framework for evaluating the efficacy and suitability of maintenance programs with a focus on quantitative risk assessment in the domain of aircraft maintenance task transfer. The analysis is anchored in the principles of Maintenance Steering Group-3 (MSG-3) logic decision paradigms. The paper advances a holistic risk assessment index architecture tailored for the task transfer of maintenance programs. Utilizing the analytic network process (ANP), the study quantifies the weight interrelationships among diverse variables, incorporating expert-elicited subjective weighting. A multielement connection number-based evaluative model is employed to characterize decision-specific data, thereby facilitating the quantification of task transfer-associated risk through the appraisal of set-pair potentials. Moreover, the paper conducts a temporal risk trend analysis founded on partial connection numbers of varying orders. This analytical construct serves to streamline the process of risk assessment pertinent to maintenance program task transfer. The empirical component of this research, exemplified through a case study of the Boeing 737NG aircraft maintenance program, corroborates the methodological robustness and pragmatic applicability of the proposed framework in the quantification and analysis of mission transfer risk.

关键词: risk evaluation     maintenance steering group     analytic network process     task transfer     maintenance program    

森林火险与气象因素的多元相关性及其分析

宋卫国,马剑,Satoh K,王健

《中国工程科学》 2006年 第8卷 第2期   页码 61-66

摘要:

森林火灾发生概率预测涉及气象、树种、地理条件与人类活动等诸因素,气象参数对火灾的影响一直是森林火灾研究的重点之一。选用日平均湿度、降水量、平均风速、平均温度和日照时间等5种典型气象参数,利用BP神经网络分析了它们对火灾发生概率的综合影响;研究了多种气象参数综合作用下火灾发生概率的变化规律。结果表明,气象参数与火灾发生概率之间存在稳定的关联,神经网络在处理多参数综合影响方面具有较好的泛化能力,可以作为预测林火概率的可靠方法,为森林火灾研究提供了基础数据。

关键词: 神经网络     森林火灾     火灾发生概率     气象参数     火灾风险    

基于工期可控性的网络进度计划仿真评价方法研究

潘菲菲,王仁超,曹永雷

《中国工程科学》 2015年 第17卷 第1期   页码 143-150

摘要:

针对工程建设过程中常常通过资源重新配置或提高资源利用率来应对风险事件可能引起工期延迟的问题,提出了基于工期可控性的网络进度计划随机仿真评价方法,以资源配置和利用裕度作为活动的可控性衡量指标,同时考虑了风险事件发生时间不同导致的风险应对措施的可实施性不同的问题,通过对各个风险事件发生时间及其引起的活动持续时间延误、风险应对效果等进行随机仿真,从而对整个项目的工期分布进行模拟,评价编制的网络进度计划的合理性。算例表明:相对于传统的基于工期和基于因素的Monte-Carlo仿真评价方法,基于工期可控性的仿真评价方法得到的结果更为合理。

关键词: 网络进度计划;随机仿真;风险应对;工期可控性;评价    

Understanding and addressing the environmental risk of microplastics

《环境科学与工程前沿(英文)》 2023年 第17卷 第1期 doi: 10.1007/s11783-023-1612-5

摘要:

Over the past decades, the plastic production has been dramatically increased. Indeed, a category of small plastic particles mainly with the shapes of fragments, fibers, or spheres, called microplastics (particles smaller than 5 mm) and nanoplastics (particles smaller than 1 μm) have attracted particular attention. Because of its wide distribution in the environment and potential adverse effects to animal and human, microplastic pollution has been reported as a serious environment problem receiving increased attention in recent years. As one of the commonly detected emerging contaminants in the environment, recent evidence indicates that the concentration of microplastics show an increasing trend, for the reason that up to 12.7 million metric tons of plastic litter is released into aquatic environment from land-based sources each year. Furthermore, microplastic exposure levels of model organisms in laboratory studies are usually several orders of magnitude higher than those found in environment, and the microplastics exposure conditions are also different with those observed in the environment. Additionally, the detection of microplastics in feces indicates that they can be excreted out of the bodies of animal and human. Hence, great uncertainties might exist in microplastics exposure and health risk assessment based on current studies, which might be exaggerated. Policies reduce microplastic emission sources and hence minimize their environmental risks are determined. To promote the above policies, we must first overcome the technical obstacles of detecting microplastics in various samples.

关键词: Emerging contaminants     Microplastics     Environment risk     Health effect    

Ecological Risk Management of Drinking Water Project: The Case Study of Kunming City

Ji-liang Zheng,Jun Hu,Xuan Zhou,Ching Yuen Luk

《工程管理前沿(英文)》 2015年 第2卷 第3期   页码 311-319 doi: 10.15302/J-FEM-2015045

摘要: Following rapid infrastructure development and industrialization, the problems of water pollution and water shortage have become more severe. Whether there is safe drinking water in cities has attracted wide attention. The ecological risk management of drinking water project is an important means of ensuring the safety of a drinking water source. Based on ecological risk assessment and management theories, this paper establishes an ecological risk management model and assessment system with the aim of providing theoretical guidance and scientific basis for formulating a policy on the safety and protection of drinking water sources in a city. Kunming is one of the cities plagued by severe water shortage in China. Its ecological risk management of drinking water has attracted the attention of both the local government and the public. Using Kunming as the case study, this paper conducts a comparative analysis and assessment on three major reservoirs that face ecological risks. It highlights the existing problems and gives helpful suggestions.

关键词: drinking water project     ecological risk     ecological risk assessment     risk management    

风险矩阵方法与应用述评

朱启超,匡兴华,沈永平

《中国工程科学》 2003年 第5卷 第1期   页码 89-94

摘要:

技术项目的风险管理一直深受美国国防部的重视。介绍了在美国国防采办风险管理中广泛应用的风险矩阵方法,并对其优缺点和适用性进行分析,结合我国国防预研技术项目管理的特点,提出我国开展技术性项目风险管理的思路。

关键词: 风险矩阵     风险管理     项目管理    

Bioaerosol emissions variations in large-scale landfill region and their health risk impacts

《环境科学与工程前沿(英文)》 2022年 第16卷 第12期 doi: 10.1007/s11783-022-1593-9

摘要:

● The airborne bacteria in landfills were 4–50 times higher than fungi.

关键词: Microbial aerosols     Landfill sites     Health risk assessment     CALPUFF    

Epidemic obesity in children and adolescents: risk factors and prevention

Eun Young Lee, Kun-Ho Yoon

《医学前沿(英文)》 2018年 第12卷 第6期   页码 658-666 doi: 10.1007/s11684-018-0640-1

摘要: The prevalence of obesity among children and adolescents (aged 2–18 years) has increased rapidly, with more than 100 million affected in 2015. Moreover, the epidemic of obesity in this population has been an important public health problem in developed and developing countries for the following reasons. Childhood and adolescent obesity tracks adulthood obesity and has been implicated in many chronic diseases, including type 2 diabetes, hypertension, and cardiovascular disease. Furthermore, childhood and adolescent obesity is linked to adulthood mortality and premature death. Although an imbalance between caloric intake and physical activity is a principal cause of childhood and adolescent obesity, environmental factors are exclusively important for development of obesity among children and adolescents. In addition to genetic and biological factors, socioenvironmental factors, including family, school, community, and national policies, can play a crucial role. The complexity of risk factors for developing obesity among children and adolescents leads to difficulty in treatment for this population. Many interventional trials for childhood and adolescent obesity have been proven ineffective. Therefore, early identification and prevention is the key to control the global epidemic of obesity. Given that the proportion of overweight children and adolescents is far greater than that of obesity, an effective prevention strategy is to focus on overweight youth, who are at high risk for developing obesity. Multifaceted, comprehensive strategies involving behavioral, psychological, and environmental risk factors must also be developed to prevent obesity among children and adolescents.

关键词: obesity     children     adolescents     epidemiology     risk factor     prevention    

Optimal risk allocation in alliance infrastructure projects: A social preference perspective

Xiang DING, Qian LI

《工程管理前沿(英文)》 2022年 第9卷 第2期   页码 326-336 doi: 10.1007/s42524-020-0145-x

摘要: The mechanism of risk allocation is designed to protect all stakeholders, and it is vital to project success. Qualitative and quantitative ways of optimizing risk allocation have been well documented in extant literature (e.g., allocation principles, models, and solutions), and the foci of existing research are usually the maximization of rational utility. Few research has focused on partners’ social preferences affecting the output of risk allocation. This study presents a quantitative approach based on modeling alliance member (AM)’s inequity aversion (IA) to analyze risk-sharing arrangements in an alliance project. Fehr and Schmidt’s inequity-aversion model is integrated into modeling partner’s utility. This paper derives results for an alliance leader (AL)’s optimal risk-sharing ratio and AM’s optimal risk-management effort simultaneously. The derivation is based on solving a restrained optimization problem using the conception and methods from Stackelberg game theory. Results show that an AM’s IA significantly affects risk allocation between AL and AM. Specifically, envious preference is positively related to AL’s optimal risk-sharing ratio, whereas guilty preference negatively affects AL’s optimal risk-sharing ratio. These findings will be of interest to academics and practitioners involved in designing alliance negotiations.

关键词: public project     contract design     risk sharing     inequity aversion     governance    

Detection of schedule delay risk of empirical construction projects

Tsegay GEBREHIWET, Hanbin LUO

《工程管理前沿(英文)》 2018年 第5卷 第2期   页码 251-267 doi: 10.15302/J-FEM-2018086

摘要: In Ethiopian construction projects, schedule delay risk is a predominant issue because it is not properly addressed. Although several studies have been focused on the various effects of risk in construction projects, limited efforts have been made to investigate the typical and the overall schedule delay risk. In this study, our aim is to detect the typical and overall schedule delay risk throughout the construction project lifecycle, which consists of the pre-construction, construction, and post-construction stages, and compare the stages with each other. Common criteria, sub-criteria, and attributes were developed for all alternatives for the purpose of making a risk decision. The methodology that was followed integrated the multiple-criteria decision-making (MCDM) model of fuzzy analytic hierarchy process comprehensive evaluation (FAHPCE) and the relative important index (RII). Data were collected from 77 participants, who were selected through purposive sampling from different contracting organizations in Ethiopian construction projects by means of questionnaires that were distributed to experienced experts. The findings showed that there is a typical delay risk either in the type or in the level of the different construction activities. Consequently, the most influenced alternative is the construction stage because of the high-risk responsibility, resource, and contract condition related criteria. The post-construction stage was the second most influenced stage because of the high-risk responsibility-related criteria. The pre-constructed stage was the least influenced stage that consist high-risk criteria of responsibility, resource, and contract condition related. These differences provided noteworthy information about risk mitigation in construction projects by identifying the exact risk level on specific activity to make appropriate decision.

关键词: fuzzy analytic hierarchy process comprehensive evaluation     construction project     detection of delay risk     relative important index    

The influencing factors of the WTP for the risk reduction of chemical industry accidents in China

Lei HUANG, Zhijuan SHAO, Weiliang BAO, Bailing DUAN, Jun BI, Zengwei YUAN

《环境科学与工程前沿(英文)》 2012年 第6卷 第6期   页码 860-868 doi: 10.1007/s11783-012-0467-y

摘要: To explore the factors that influence respondents’ willingness to pay (WTP) for the risk reduction of chemical industry accidents, a questionnaire survey combined with contingent valuation and psychometric paradigm methods were conducted in the city of Yancheng, Jiangsu Province, China. Both traditional socioeconomic variables and perceived characteristics of the hazards were considered in this study, and a Tobit model was used to find the factors influencing WTP under three risk reduction scenarios. The results showed that three demographic characteristics, , , and , significantly affected the WTP for chemical risk reduction. In addition, three extracted public risk perception factors, , , and , also strongly affected the WTP. The mean WTP value increased as the magnitude of the risk reduction increased. The number of factors influencing the WTP decreased as the reduction level improved, and only the factor had a significant influence on the WTP for a higher level (80%) of risk reduction. The cost for chemical safety management of Yancheng was calculated, and the optimized risk reduction level was determined. These findings can assist governments and policy makers to formulate suitable strategies for risk control, to reach target groups of people to develop effective communication, and to provide specific references for the best investment for the security of local residents.

关键词: risk perception     willingness to pay     contingent valuation method     risk management school of the environment    

风险矩阵法在武器装备采办风险评估中的运用

李忠民,魏一鸣,汤淑春,陈健

《中国工程科学》 2006年 第8卷 第6期   页码 95-99

摘要:

在对国外广泛采用的风险矩阵评估方法进行全面分析和系统总结的基础上,对风险矩阵方法在我国武器装备采办风险评估中的运用进行了探讨,并从风险影响和风险概率两个准则入手,以某武器型号采办为例示范性地进行了风险评估,从而为制定科学合理的武器装备采办风险管理提供决策依据。

关键词: 风险矩阵方法     风险评估     武器装备采办    

标题 作者 时间 类型 操作

Hybrid deep learning model for risk prediction of fracture in patients with diabetes and osteoporosis

期刊论文

Two-stage stochastic programming with robust constraints for the logistics network post-disruption response

期刊论文

Molecular network-based intervention brings us closer to ending the HIV pandemic

Xiaoxu Han, Bin Zhao, Minghui An, Ping Zhong, Hong Shang

期刊论文

Risk evaluation for the task transfer of an aircraft maintenance program based on a multielement connection

期刊论文

森林火险与气象因素的多元相关性及其分析

宋卫国,马剑,Satoh K,王健

期刊论文

基于工期可控性的网络进度计划仿真评价方法研究

潘菲菲,王仁超,曹永雷

期刊论文

Understanding and addressing the environmental risk of microplastics

期刊论文

Ecological Risk Management of Drinking Water Project: The Case Study of Kunming City

Ji-liang Zheng,Jun Hu,Xuan Zhou,Ching Yuen Luk

期刊论文

风险矩阵方法与应用述评

朱启超,匡兴华,沈永平

期刊论文

Bioaerosol emissions variations in large-scale landfill region and their health risk impacts

期刊论文

Epidemic obesity in children and adolescents: risk factors and prevention

Eun Young Lee, Kun-Ho Yoon

期刊论文

Optimal risk allocation in alliance infrastructure projects: A social preference perspective

Xiang DING, Qian LI

期刊论文

Detection of schedule delay risk of empirical construction projects

Tsegay GEBREHIWET, Hanbin LUO

期刊论文

The influencing factors of the WTP for the risk reduction of chemical industry accidents in China

Lei HUANG, Zhijuan SHAO, Weiliang BAO, Bailing DUAN, Jun BI, Zengwei YUAN

期刊论文

风险矩阵法在武器装备采办风险评估中的运用

李忠民,魏一鸣,汤淑春,陈健

期刊论文